ADF Serials | Help Search Members Calendar |
Welcome Guest ( Log In | Register ) | Resend Validation Email |
Luig |
Posted: Nov 23 2006, 06:39 PM
|
FA-18F Super Hornet (A44) Group: ADF Serials Team Posts: 2,011 Member No.: 80 Joined: 8-March 06 |
http://rnzaf.proboards43.com/index.cgi?board=Aussie&action=display&thread=1164237680
Seasprite decision by next year November 22, 2006 03:18pm Article from: AAP. The fate of the controversial Seasprite helicopters will be known next year with Cabinet set to sign off on a final decision on either persevering or killing off the project. Defence Minister Brendan Nelson said he had refined his three options - continuing to completion, accepting a lesser level of capability or cancelling the project entirely - down to two. But he declined to say which two remained. "I held a very high level meeting last week with the appropriate defence, naval, air force and Defence Materiel Organisation officials," he said. "I have asked for a little bit more work to be done. I was anticipating a decision on this before Christmas but it won't be until the new year now. "I will take a recommendation to Cabinet as it is a decision that needs to be made by cabinet. We need to take the next step with our eyes open." The $1 billion Seasprite project dates from 1997 when the Government ordered 11 helicopters from the US company Kaman to operate from the Navy's Anzac frigates. What wasn't widely known at the time was that Australia was buying used but fully refurbished choppers, with seven built between 1963 and 1965 and others in the mid-1980s. It wasn't the airframes that were the problem. Rather, Defence specified a very advanced radar and weapons capability including computer datalinks enabling the Seasprites to serve as the extended eyes of a warship 50 kilometres away. There have been problems with aircraft flight control systems but the major cause of delay was in integrating the software combat system. Dr Nelson said he remained satisfied the navy still needed the capability for a helicopter, flying from a frigate, to fire anti-ship missiles. He said he would discuss the project with Kaman officials in Washington next month. "One thing is for sure, if on balance proceeding or not proceeding is the preferred way to go, I am very happy to make that decision," he said. "I hasten to add for those who derive a perverse sense of pleasure from projects that don't go as well as they should, this is a legacy project. This is not a project we would go into today. "We wouldn't take a 1960s platform and put 2006 technology into it. The challenge here was to put 2006 Commodore technology into an EH Holden. "In 2006 we would not go into a project that gives us 11 helicopters of their technological type that are the only ones in the world." Phil. |
darren.crick |
Posted: Nov 24 2006, 10:36 AM
|
ADF Serials Webmaster Group: ADF Serials Admin Posts: 1,782 Member No.: 2 Joined: 29-May 05 |
have we tried to do something more with the Seasprites??
Others seem to have operated them without issues... |